How handmade roof tiles are made

This is how handmade roof tiles are made at Tudor: sand is thrown into a mould, Etruria Marl clay is pressed in by hand and cut to thickness, and the tile is dried for at least six days before firing at about 1080°C for 33 hours. Each one is then sorted for quality and colour.

Request samplesCall 01797 320202

A Tudor craftsman pressing clay into a tile mould

Making a handmade roof tile, step by step

  1. Etruria Marl clay at the Tudor factory

    Ready-processed clay

    Etruria Marl clay arrives processed and quality checked. From here, the work is all by hand.

  2. An empty tile mould

    The mould

    Each tile is formed in its own mould.

  3. Sand being thrown into a tile mould

    Sand in the mould

    Kent sand is thrown into the mould. It becomes the face, colour and texture of the tile.

  4. Clay going into a tile mould

    Clay into the mould

    A lump of clay is thrown into the mould.

  5. Clay for tile nibs

    Clay for the nibs

    Extra clay forms the nibs on the back of plain tiles.

  6. A tile mould being knocked

    Two knocks

    The mould is banged twice to settle the clay.

  7. Clay being pressed into a mould

    Pressed

    The clay is pressed into every corner of the mould.

  8. The back of a tile being cut to thickness

    Cut to thickness

    The back is cut away to leave the right thickness.

  9. A soft tile removed from the mould

    Out of the mould

    The soft tile is turned out of the mould.

  10. Excess clay being removed

    Trimmed

    Excess clay is trimmed away by hand.

  11. Tiles on a drying tray

    Onto the drying tray

    Tiles are laid out on drying trays.

  12. Drying trays stacked in racks

    Six days in the racks

    Trays go into racks for at least six days, until 99.8% of the moisture has gone.

  13. Tiles going into the kiln

    Into the kiln

    Tiles are fired to about 1080°C, a firing that takes 33 hours.

  14. Fired tiles sorted for quality and colour

    Sorted by eye

    When cool, every tile is sorted for quality and colour.

  15. Pallets of finished tiles ready for delivery

    Ready for delivery

    Tiles are palletised, wrapped and stored. The stock area holds over a million tiles.

Why we still make roof tiles by hand

Experience matters. Will, our Factory Production Manager, has worked at Tudor since 1991 and in every department, from clay preparation to colour blending and firing. Modern kiln technology then lets us check every tile and catch imperfections before tiles leave the factory.

Different clay seams fire to different colours. The Roof Tile Association explains how seams such as Etruria Marl behave in its guide to the best visual effect.

Watch the process in our factory videos, or book a factory visit.

Questions about how handmade roof tiles are made

How long does it take to make a handmade roof tile?

Drying takes at least six days and firing takes 33 hours, so a tile takes well over a week from clay to finished product.

What temperature are clay roof tiles fired at?

Tudor tiles are fired to about 1080°C.

What clay are Tudor tiles made from?

Etruria Marl, a dense, high-quality clay, delivered to the factory ready processed and quality checked.

Can I watch tiles being made?

Yes. Factory visits are welcome by appointment: call 01797 320202.

See the tiles before you choose

We deliver samples by hand wherever we can, and you are welcome at the factory in Lydd by appointment.

Request samplesArrange a factory visit

Talk to the team

01797 320202

Dengemarsh Road, Lydd, Kent TN29 9JH